Results of expert judgments on the faults and risks with Autosub3 and an analysis of its campaign to Pine Island Bay, Antarctica, 2009
Brito, Mario P.; Griffiths, Gwyn. 2009 Results of expert judgments on the faults and risks with Autosub3 and an analysis of its campaign to Pine Island Bay, Antarctica, 2009. In: Proceedings of the International Symposium on Unmanned Untethered Submersible Technology (UUST 2009), Durham, New Hampshire, 23-26 August 2009. Durham NH, USA, Autonomous Undersea Systems Institute (AUSI), [14p].
Before downloading, please read NORA policies.Preview |
PDF
UUST09_Griffiths_et_al_RESULTS_OF_EXPERT_JUDGMENTS.pdf Download (502kB) | Preview |
Abstract/Summary
Probabilistic risk assessment is a methodology that can be systematically applied to estimate the risk associated with the design and operation of complex systems. The National Oceanography Centre, Southampton, UK has developed a risk management process tailored to the operation of autonomous underwater vehicles. Central to the application of the risk management process is a probabilistic risk assessment. The risk management process was applied to estimate the risk associated with an Autosub3 science campaign in the Pine Island Glacier, Antarctica, and to support decision making. The campaign was successful. In this paper we present the Autosub3 risk model and we show how this model was used to assess the campaign risk.
Item Type: | Publication - Book Section |
---|---|
Additional Information. Not used in RCUK Gateway to Research.: | Proceedings issued on CDROM |
Date made live: | 22 Oct 2009 +0 (UTC) |
URI: | https://nora.nerc.ac.uk/id/eprint/169183 |
Actions (login required)
View Item |
Document Downloads
Downloads for past 30 days
Downloads per month over past year