Explore open access research and scholarly works from NERC Open Research Archive

Advanced Search

The design, operation and calibration of the permanent flow measurement structures in the Plynlimon experimental catchments

Smart, J. D. G.. 1977 The design, operation and calibration of the permanent flow measurement structures in the Plynlimon experimental catchments. Wallingford, Institute of Hydrology. (IH Report No.42) (Unpublished)

Documents
5769:2645
[thumbnail of IH_042.pdf]
Preview
IH_042.pdf

Download (1MB)
Information
Programmes:
UNSPECIFIED
Library
Statistics

Downloads per month over past year

More statistics for this item...

Share
Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email
View Item