O Dochartaigh, Brighid. 2005 Hydrogeological report on Chapeltonmoss Spring. British Geological Survey, 17pp. (CR/05/065N) (Unpublished)
Abstract
The Chapeltonmoss Spring supplies water to Benromach Distillery at Forres. The spring
outlet takes the form of a pipe discharging to the ground surface into a drainage ditch flowing
to the Burn of Mosset (Figure 1). A separate pipe collects water from the spring outlet pipe
and carries it to Benromach Distillery via a system of collection tanks and sand filters.
The Chapeltonmoss Spring does not form a spring in the true sense (i.e., a discharge of
groundwater directly from an aquifer to the ground surface). The water discharging at the
spring outlet pipe travels from various sources through a mixed system of buried pipes and
surface water flows.
The Chapeltonmoss area is part of a proposed flood alleviation scheme that would see a
large part of the area covered by stored flood water during high flow times, including the
current spring outlet pipe and at least part of the spring catchment area. The size of the
proposed flooded area and the duration of flooding events will vary depending on the nature
of the flow event.
This report considers the following: