nerc.ac.uk

Conceptual site model of Makmal gold mine, Kyrgyz Republic. Final report, October 2011

Palumbo-Roe, Barbara; Banks, Vanessa. 2011 Conceptual site model of Makmal gold mine, Kyrgyz Republic. Final report, October 2011. British Geological Survey, 45pp.

Before downloading, please read NORA policies.
[img]
Preview
Text
EO-MINERS-D3.1-3 CSM Makmal FINAL_signed_20120329.pdf

Download (2MB) | Preview

Abstract/Summary

This report presents the work undertaken as part of the EO MINERS WP3 - project task 3.1. “Site Specific Available Data Collection” and develops a conceptual site model (CSM) for the Makmal Gold mine, Kyrgyz Republic. The aim is: i) to present the available information regarding known apparent environmental impacts; ii) to define the environmental setting that would influence the transport of contaminants from the source to the exposed individuals or environmental receptors, through identified potential exposure pathways; iii) to describe the source- pathway-receptor interactions using a CSM. Examining the CSM results in the identification of data gaps and information needed for a full environmental assessment of mining of the Makmal ore deposit and provides the rational for EO selection.

Item Type: Publication - Report
Funders/Sponsors: European Commission
NORA Subject Terms: Earth Sciences
Date made live: 27 Mar 2014 16:07 +0 (UTC)
URI: https://nora.nerc.ac.uk/id/eprint/506745

Actions (login required)

View Item View Item

Document Downloads

Downloads for past 30 days

Downloads per month over past year

More statistics for this item...