nerc.ac.uk

The design, operation and calibration of the permanent flow measurement structures in the Plynlimon experimental catchments

Smart, J. D. G.. 1977 The design, operation and calibration of the permanent flow measurement structures in the Plynlimon experimental catchments. Wallingford, Institute of Hydrology. (IH Report No.42) (Unpublished)

Before downloading, please read NORA policies.
[img]
Preview
Text
IH_042.pdf

Download (1MB)
Item Type: Publication - Report
Programmes: CEH Programmes pre-2009 publications > Other
UKCEH and CEH Sections/Science Areas: _ Pre-2000 sections
Funders/Sponsors: NERC
Additional Information. Not used in RCUK Gateway to Research.: scanned legacy working document
Additional Keywords: flow measurement, weirs, flumes, Wales, Wye, Severn
NORA Subject Terms: Ecology and Environment
Hydrology
Date made live: 22 Jan 2009 14:36 +0 (UTC)
URI: https://nora.nerc.ac.uk/id/eprint/5769

Actions (login required)

View Item View Item

Document Downloads

Downloads for past 30 days

Downloads per month over past year

More statistics for this item...