Explore open access research and scholarly works from NERC Open Research Archive

Advanced Search

A pilot groundwater temperature network for England

Bloomfield, J.P. ORCID: https://orcid.org/0000-0002-5730-1723; Bunting, S.; McKenzie, A.; Sorensen, J.; Williams, P.. 2022 A pilot groundwater temperature network for England. Nottingham, UK, British Geological Survey, 77pp. (OR/22/033) (Unpublished)

Abstract

The project described in this report was commissioned by the Environment Agency and conducted by the British Geological Survey between November 2021 and March 2022. The project consisted of obtaining groundwater temperature profiles for selected OBHs and the design and implementation of a pilot groundwater temperature monitoring network within four pilot catchments in England. The purpose was to obtain information that can be used by the EA to inform the development of a future national groundwater temperature monitoring network for England.
This report details the selection of the pilot catchments, describes the groundwater temperature profiles obtained and design and implementation of the pilot network, and identifies lessons learnt relevant to the development of a future national groundwater temperature network.
The project forms part of the UK’s wider Natural Capital and Ecosystem Assessment (NCEA) programme.

Documents
542247:277907
[thumbnail of OR22033.pdf]
Preview
OR22033.pdf

Download (4MB) | Preview
Before downloading, please read NORA policies.
Information
Programmes:
BGS Programmes 2020 > Environmental change, adaptation & resilience
Library
Statistics

Downloads per month over past year

More statistics for this item...

Share
Add to AnyAdd to TwitterAdd to FacebookAdd to LinkedinAdd to PinterestAdd to Email
View Item