Model metadata report for HS2 area 1 (Great Missenden to Aylesbury)
Farrant, A.R.. 2017 Model metadata report for HS2 area 1 (Great Missenden to Aylesbury). Nottingham, UK, British Geological Survey, 22pp. (OR/14/075) (Unpublished)
Before downloading, please read NORA policies.
|
Text
OR14075.pdf Download (6MB) | Preview |
Abstract/Summary
This report describes the 3D geological model of HS2 (High Speed 2 rail link) Area 1 (Great Missenden to Aylesbury), created by Dr Andrew Farrant with support from Steve Thorpe and Ricky Terrington. The model was created as part of a set of nine geological models that cover the proposed HS2 rail route from the end of the HS2 London model to Birmingham and the West Coast Main Line near Lichfield. The models were funded from the NERC/BGS Science Budget to promote BGS modelling and geological interpretation services to this important infrastructure project and to test methodologies and procedures for creating geological models by multiple compilers. The report describes the model construction and purpose, with spatial limits and scale, sources of information, data processing, workflow, decisions, assumptions, rules and limitations, together with images of the model.
Item Type: | Publication - Report |
---|---|
Funders/Sponsors: | British Geological Survey |
Additional Information. Not used in RCUK Gateway to Research.: | This item has been internally reviewed, but not externally peer-reviewed. |
Date made live: | 13 Feb 2018 15:41 +0 (UTC) |
URI: | https://nora.nerc.ac.uk/id/eprint/519288 |
Actions (login required)
View Item |
Document Downloads
Downloads for past 30 days
Downloads per month over past year