nerc.ac.uk

Reliability Case Notes No. 10. Board of Inquiry: Circumstances surrounding the stranding of the AutoNaut ‘Gordon’ on the Plymouth coast on 7th November 2014.

Brito, M.P.. 2015 Reliability Case Notes No. 10. Board of Inquiry: Circumstances surrounding the stranding of the AutoNaut ‘Gordon’ on the Plymouth coast on 7th November 2014. Southampton, National Oceanography Centre, 91pp. (National Oceanography Centre Research and Consultancy Report, 52)

Before downloading, please read NORA policies.
[img] Text
NOC_R&C_52.pdf
Restricted to NERC registered users only

Download (9MB) | Request a copy

Abstract/Summary

The Marine Autonomous Systems in Support of Marine Operations (MASSMO) was a project funded by the Natural Environment Research Council, United Kingdom. Autonaut ‘Gordon’ met all objectives set out in MASSMO mission plan. The vehicle has survived extreme storms in phase 1, whilst gathering valuable science data using state of the art sensors, such as novel passive acoustic devices. In phase 2, the vehicle was successfully deployed to detect tagged fish. In phase 2, Autonaut ‘Gordon’ was deployed on 4th November 2014, at 11.10 am, from Plymouth bay, and transited out 7.2 km East to position 50.337°Latitude, ‐ 4.13367°Longitude, to start ranging tests and the campaign. The mission was terminated, under NERC’s instructions, on November 6th. During recovery, in the early hours of November 7th, Autonaut ‘Gordon’ was grounded. This resulted in severe damage to the vessel. This Inquiry report looks at the circumstances that have led to the grounding of Autonaut ‘Gordon’ with the aim of diagnosing the most likely root cause for the accident. The grounding of Autonaut ‘Gordon’ was caused by severe weather. However, this report concludes that planning error was the most influential root cause for the accident. The last waypoint, WPT1, was approximately 0.5 miles from Shagstone and lee shore on east side of Harbour entrance. This has put the vehicle in a vulnerable position. The report also concludes that rushed planning was the second most influential root cause for planning error. This report presents analysis of all other potential root causes considered by the Inquiry panel and raises recommendations to mitigate the risk of marine autonomous systems grounding in future deployments.

Item Type: Publication - Report
NORA Subject Terms: Marine Sciences
Date made live: 23 Sep 2015 13:08 +0 (UTC)
URI: https://nora.nerc.ac.uk/id/eprint/511848

Actions (login required)

View Item View Item

Document Downloads

Downloads for past 30 days

Downloads per month over past year

More statistics for this item...